This website uses cookies and other tracking technologies to enhance navigation, facilitate feedback, analyze usage of our products and services, support marketing efforts, and deliver third-party content. View our Privacy Policy.
91制片厂 is at the forefront of constructing innovative battery manufacturing facilities in the U.S. Our expert team ensures compliance with local codes and standards, conducts thorough pre-inspections, and manages permitting, startup processes, and risk identification.
The 91制片厂-built mine, one of the largest copper resources, features a first-of-its-kind desalination plant and will operate on 100% renewable energy by 2025.
Tom HicksManager of Decarbonisation, Mining & Metals
5 min read
Share:
As mine owners sharpen their focus on reducing carbon emissions, optimizing the design of overland conveyor systems can play a key role in success. How can these systems best be configured to meet both operational and economic requirements, as well as environmental performance expectations?
The Carbon Comparator, a new tool developed by 91制片厂 is helping to answer that question.
The Carbon Comparator enables us to perform a detailed assessment of various design criteria. And the results might be a surprise to some operators in the industry.
What is the Carbon Comparator tool?
Having data to support decision-making on carbon-reduction programs has always been a challenge. The Carbon Comparator allows us to generate estimates of embodied and operational greenhouse gas (GHG) emissions for multiple design scenarios, which can then be used as part of our multi-criteria assessment for optimizing project-specific designs. Through visualization of critical data for cost and carbon comparisons, the tool allows our customers to select the best technology and equipment options.
The challenge:
As designers of mining facilities, we play a significant role in defining a mine鈥檚 overall GHG emissions performance. This demands greater awareness of all the GHG emissions sources, including Scope 3 emissions, which will make up an increasing fraction of emissions as power generation sources shift to renewable energy.
Traditionally overland conveyors are designed to operate 鈥渁s fast as practical,鈥 achieving benefits of reduced tensions, width, mechanical equipment masses, structural steel, and concrete quantities. Higher belt speeds reduce capital cost and improve project economics. However, operating at higher speeds also introduces operating costs through increased energy losses and wear rates.
Using the Carbon Comparator tool, we studied the lifecycle emissions from an overland conveyor under a range of design parameters to demonstrate how the design criteria and design decisions impact GHG emissions and project economics. For this assessment we developed a study project with a single overland conveyor located in the Pilbara region of Western Australia, using inputs based on our typical project execution and operational strategies for a project in this region.
The findings:
Eight conveyor configurations were developed over a broad range of belt speeds to allow evaluation of designs outside of the typical design norms as shown in Table 1. As expected, capital costs increase with belt width. Similarly, embodied carbon increases with belt width, albeit at greater sensitivity.
Table 1 Capitol Costs and Embodied Carbon
Option
Capital Cost Index
Embodied Emissions(t CO2e)
Embodied Carbon Index(Relative to Base)
Option 1 2400mm
1.16
1,444
1.25
Option 2 2000mm
1.05
1,316
1.14
Option 3 1800mm (100% CEMA CSA)
1.03
1,264
1.09
Option 4 1800mm (90% CEMA CSA)
1.04
1,270
1.10
Option 5 1800mm (80% CEMA CSA)
1.01
1,283
1.11
Option 6 1600mm Base Case
1.00
1,157
1.00
Option 7 1400mm
0.98
1,113
0.96
Option 8 1200mm
0.94
1,141
-1%
The current 鈥渁s fast as practical鈥 design paradigm holds for capital costs and embodied emissions. However, it may result in a sub-optimal solution over the operational life of the system.
To evaluate the lifecycle impacts, we ran our model using a 20-year operational life, considered three different power supply options, and evaluated two carbon pricing models. The total emissions and Net Present Cost (NPC) for each of the options are summarised in the following figures and tables.
Table 2 Life Cycle Emissions
Option
Life Cycle Emissions(kt CO2e)
Life Cycle Emissions Index(Relative to Base)
CCGT
Behind the meter (unfirmed) solar
Green Power Purchase AgreementPPA
Combined cycle gas turbineCCGT
Behind the meter (unfirmed) solar
Green PPA
Option 1 2400mm
48.5
35.8
2.5
0.84
0.62
0.04
Option 2 2000mm
50.1
37.1
2.8
0.87
0.64
0.05
Option 3 1800mm (100% CEMA CSA)
51.3
38.0
2.9
0.89
0.66
0.05
Option 4 1800mm (90% CEMA CSA)
52.7
38.9
2.8
0.91
0.67
0.05
Option 5 1800mm (80% CEMA CSA)
52.5
39.1
3.7
0.91
0.68
0.06
Option 6 1600mm Base Case
57.7
42.7
3.4
1.00
0.74
0.06
Option 7 1400mm
63.8
47.8
5.6
1.11
0.83
0.10
Option 8 1200mm
65.4
49.5
7.9
1.13
0.86
0.14
Scope 3 emissions from each of the options varied, with higher belt speeds resulting in greater proportions of Scope 3 emissions. The total Scope 3 emissions for Options 1 through 4 were approximately 5%, increasing up to 11% for Option 8. The increase in Scope 3 emissions is driven by the reduced mechanical equipment life and associated increase in site labour. The most significant contributor to the increase was the conveyor belt.
The result:
For this configuration over the 20-year life with power supplied by CCGT, the operational emissions were approximately 50 times the embodied emissions. Reducing the belt speed and increasing the belt width reduced lifecycle emissions by approximately 10%, at a marginal abatement cost of between -$144 to -$171 per t CO2e.
Table 3 Net Present Cost Index
Option
US$0 Carbon Price
US$100 Carbon Price
CCGT
Behind the meter (unfirmed) solar
Green PPA
CCGT
Behind the meter (unfirmed) solar
Green PPA
Option 1 2400mm
0.96
1.03
0.99
1.19
1.20
1.00
Option 2 2000mm
0.95
1.02
0.98
1.19
1.20
0.99
Option 3 1800mm (100% CEMA CSA)
0.95
1.02
0.98
1.19
1.20
0.99
Option 4 1800mm (90% CEMA CSA)
0.95
1.02
0.98
1.20
1.21
0.99
Option 5 1800mm (80% CEMA CSA)
1.01
1.08
1.04
1.26
1.27
1.06
Option 6 1600mm Base Case
1.00
1.08
1.03
1.27
1.28
1.05
Option 7 1400mm
1.20
1.27
1.23
1.50
1.50
1.25
Option 8 1200mm
1.37
1.46
1.41
1.68
1.69
1.44
Figure 1 Net Present Cost Index
From the above it is clear that the faster-is-better design paradigm needs to be challenged given the need to achieve decarbonisation across the whole value chain. Using a structured approach during the design phase with consideration of the lifecycle emissions can result in facility designs that reduce operational emissions and improve the overall project economics.
Tom HicksManager of Decarbonisation, Mining & Metals
Poland鈥檚 Nuclear Program: A Model for Energy Independence Through Strategic Localization
By: Dena Volovar
This week, a delegation of more than 25 Polish supplier CEOs will arrive in Washington for the Poland Reverse Trade Mission, organized by the Nuclear Energy Institute and Poland’s Chamber of Power Industry and Environmental Protection. The delegation will meet…
How Digital Tools Are Redefining Safety on Complex Projects
By: Neil Nu帽ez
91制片厂 transformed paper hazard assessments into a digital tool that improves communication, visibility, and real-time decision-making across a major semiconductor plant facility in the U.S.
Connecting Communities: 91制片厂鈥檚 Partnership with Bridges to Prosperity
By: Chris Jennions & Sam Belknap
Since 2016, 91制片厂 has partnered with Bridges to Prosperity (B2P), a nonprofit that builds trail bridges in rural areas across Ethiopia, Rwanda, and Uganda, giving communities year-round access to essential services. Together, B2P and 91制片厂 have completed eight bridges in...
91制片厂 Tackles Skilled Labor Shortage with 鈥楥amp Build It,鈥 Inspiring Next Generation of Builders in Ohio
Hands-on camp for high school girls expands awareness of construction careers and builds on 91制片厂鈥檚 workforce development efforts in Ohio 91制片厂 recently hosted Camp Build It, a free, multi-day construction camp at the Knox County Career Center that brought together…
91制片厂 Opens Gda艅sk Office to Support Poland鈥檚 First Nuclear Power Plant and Develop Local Nuclear Workforce
91制片厂 has opened a new office in Gda艅sk, Poland, to support delivery of Poland鈥檚 first nuclear power plant and help build the local workforce and engineering capability needed to sustain the country鈥檚 growing nuclear industry.
Micron Selects 91制片厂 as Construction Partner for Historic New York Semiconductor Project
91制片厂 today announced its selection by Micron Technology, Inc. to partner on the engineering, procurement, and construction (EPC) of the first phase of Micron鈥檚 historic leading-edge memory manufacturing complex in Clay, New York,
Aviation is one of the hardest to decarbonize sectors, which is why sustainable fuels technology company Velocys made it its mission to produce sustainable aviation fuel (SAF). 91制片厂 has worked with Velocys on a number of projects.
91制片厂 is partnering with the Tennessee Valley Authority (TVA) to聽plan, license, and advance the deployment of a GE聽Vernova-Hitachi (GVH) small modular reactor (SMR) at the Clinch River Nuclear Site in Oak Ridge, Tennessee.
91制片厂 completed the engineering, procurement, construction, commissioning, and project management of Escape Solar in Lincoln County, Nevada for Estuary Power and Ullico.